Dust Control on Metro Tunnel Project

2021-09-14T12:51:45+10:00

The Metro Tunnel provided some unique challenges for the ventilation design, including space and noise constraints plus the location on excavation works within the CBD. The design was created using Ventsim Design 5 to simulate ventilation, airflows, pressures, heat, gases, radon, fire and other key ventilation data to be considered, along with managing the financial constraints of the project.

Go to Top